Office Chairs

Revolving High Back Chair

In stock

Description

Here is a professional assembly guide you can use for your business Chirag Steel when assembling a Revolving High Back Chair for customers.

🪑 Revolving High Back Chair – Assembly Guide

For: Chirag Steel

This guide applies to most standard revolving high back office chairs with height adjustment and tilt mechanism.

📦 Parts Included

Before starting, check all parts:

High backrest

Seat cushion

5-leg star base

Gas lift cylinder

Hydraulic cover (plastic telescopic cover)

Tilt/control mechanism

Armrests (Left & Right)

5 Casters (wheels)

Screws & washers pack

Allen key (tool)

🛠️ Step-by-Step Assembly Process

1️⃣ Install the Casters (Wheels)

Turn the star base upside down.

Push each caster firmly into the holes at the end of each leg.

Ensure all wheels rotate freely.

2️⃣ Insert the Gas Lift

Turn the base upright.

Insert the gas lift cylinder into the center hole.

Place the plastic hydraulic cover over the cylinder (if provided).

3️⃣ Attach Tilt Mechanism to Seat

Turn the seat upside down.

Align the tilt/control mechanism with the pre-drilled holes.

Make sure the “FRONT” marking faces the front of the seat.

Tighten screws using the Allen key.

4️⃣ Install Armrests

Identify left and right armrests.

Align them with side holes of the seat.

Insert bolts and tighten properly.

5️⃣ Fix the High Backrest

Align the backrest with the seat bracket.

Insert screws through the back support plate.

Tighten securely (do not overtighten).

6️⃣ Mount Seat on Gas Lift

Lift the assembled upper portion.

Place the center hole over the gas lift top.

Press down firmly to lock into place.

✅ Final Quality Check (Important for Chirag Steel)

✔ Test height adjustment lever

✔ Check tilt/recline function

✔ Ensure chair swivels smoothly

✔ Confirm all screws are tight

✔ Perform weight test (minimum 80–100 kg)

⏱️ Assembly Time

New Worker: 12–15 minutes

Experienced Worker: 6–8 minutes

🏭 Suggested Assembly Workflow for Your Business

Station 1: Base + Wheels

Station 2: Mechanism + Armrests

Station 3: Backrest Fixing

Station 4: Final Assembly + QC Testing

If you want, I can also create:

✅ Printable PDF assembly sheet with your company name Chirag Steel

✅ Product description for selling online

✅ Warranty & instruction card content

✅ Bulk packaging checklist

Tell me what you need next 👍